﻿<?xml version="1.0" encoding="utf-8"?>
<rss version="2.0">
  <channel>
    <title>Housing and Residence Education News</title>
    <link>http://housing.osu.edu/feeds/news/</link>
    <description>The latest news from Housing and Residence Education at OSU</description>
    <copyright>Copyright 2001 - 2026, Office of Student Life. All rights reserved</copyright>
    <item>
      <title>Residence Halls Remain Open for Fall Break</title>
      <description>
All Residence Halls will remain open during fall break, October 15-16. Staff members will be in the halls during the break and a limited number of front desks will be open...</description>
      <link>http://housing.osu.edu/articles/residence-halls-remain-open-for-fall-break/</link>
      <pubDate>Fri, 04 Sep 2015 21:05:02 GMT</pubDate>
    </item>
    <item>
      <title>North Towers Renovation FAQ</title>
      <description>
What is the project timeline?&amp;nbsp;

&amp;nbsp;Work is expected to begin following spring semester 2026. Taylor and Drackett Towers are scheduled to be available to students at the start of autumn semester&amp;nbsp;2028...</description>
      <link>http://housing.osu.edu/articles/north-towers-renovation-faq/</link>
      <pubDate>Wed, 11 Mar 2026 20:06:37 GMT</pubDate>
    </item>
  </channel>
</rss>